by PushtoLearn
8. On the ground
Table of Contents
8. On the ground, English for Aviation Exercises and Flashcards
Wordlist for 8. On the ground, English for Aviation
Word | Example |
taxiing | The aircraft is taxiing to the runway for takeoff. |
pushback | The pushback was delayed due to a technical issue. |
ground control | Ground control directed the aircraft to the correct gate. |
apron | The aircraft is parked at the apron awaiting clearance. |
gate | Passengers will disembark at gate 22. |
ramp | The baggage is being unloaded from the ramp. |
taxiway | The aircraft is moving along the taxiway to the runway. |
aircraft ground power unit | The aircraft is connected to the aircraft ground power unit. |
flight deck | The flight deck crew is conducting pre-flight checks. |
ground crew | The ground crew is preparing the aircraft for departure. |
tow | The aircraft is being towed to the hangar for maintenance. |
hangar | The aircraft will be stored in the hangar overnight. |
check-in | Passengers should complete check-in before boarding. |
baggage claim | Passengers can pick up their luggage at baggage claim carousel 5. |
de-icing | The aircraft is undergoing de-icing before takeoff. |
fueling | The fueling process is almost complete. |
pre-flight inspection | A pre-flight inspection is required before every departure. |
boarding | Boarding will begin in 10 minutes at gate 14. |
ground handling | The ground handling crew is preparing the aircraft for takeoff. |
ramp agent | The ramp agent coordinates baggage handling and aircraft movement. |
pushback tractor | The pushback tractor is ready to move the plane from the gate. |
cabin crew | The cabin crew is preparing for the flight. |
airbridge | Passengers are boarding through the airbridge. |
gate agent | The gate agent will announce the boarding process. |
ground delay | There is a ground delay due to a backlog of flights. |
boarding pass | Please show your boarding pass before entering the gate area. |
refuel | The aircraft is being refueled before departure. |
maintenance check | The aircraft is undergoing a routine maintenance check. |
flight operations | Flight operations are running smoothly today. |
emergency evacuation | The emergency evacuation drill was successfully completed. |
terminal | Passengers should proceed to terminal B for international flights. |
disembark | The passengers will disembark after the aircraft has parked at the gate. |
boarding gate | The boarding gate is located on the left side of the terminal. |
airport shuttle | An airport shuttle is available to transport passengers to the terminal. |
ground support equipment | The ground support equipment is ready for use. |
terminal building | The terminal building houses check-in counters and baggage claim. |
aircraft servicing | The aircraft servicing team is checking the aircraft systems. |
gate hold | The aircraft is in a gate hold due to a delay in the runway. |
security screening | Passengers must undergo security screening before entering the gate. |
parking position | The aircraft is now in its parking position. |
departure lounge | Passengers can relax in the departure lounge before boarding. |
ground power unit | The ground power unit has been connected to the aircraft. |
check-in counter | Please go to the check-in counter to receive your boarding pass. |
security checkpoint | Make sure to reach the security checkpoint before your flight time. |
aircraft parking | The aircraft is parked next to the terminal after arrival. |
passenger jet bridge | The passenger jet bridge connects the aircraft to the terminal. |
ground crew member | The ground crew member will guide the aircraft to the gate. |
aircraft towing system | The aircraft towing system is used to move the aircraft on the ground. |
lavatory servicing | Lavatory servicing is performed during the ground stop. |
cargo handling | The cargo handling team is loading the cargo into the aircraft. |