by PushtoLearn
8. On the ground
Table of Contents
8. On the ground, English for Aviation Exercises and Flashcards
Wordlist for 8. On the ground, English for Aviation
|
Word |
Example |
|
taxiing |
The aircraft is taxiing to the runway for takeoff. |
|
pushback |
The pushback was delayed due to a technical issue. |
|
ground control |
Ground control directed the aircraft to the correct gate. |
|
apron |
The aircraft is parked at the apron awaiting clearance. |
|
gate |
Passengers will disembark at gate 22. |
|
ramp |
The baggage is being unloaded from the ramp. |
|
taxiway |
The aircraft is moving along the taxiway to the runway. |
|
aircraft ground power unit |
The aircraft is connected to the aircraft ground power unit. |
|
flight deck |
The flight deck crew is conducting pre-flight checks. |
|
ground crew |
The ground crew is preparing the aircraft for departure. |
|
tow |
The aircraft is being towed to the hangar for maintenance. |
|
hangar |
The aircraft will be stored in the hangar overnight. |
|
check-in |
Passengers should complete check-in before boarding. |
|
baggage claim |
Passengers can pick up their luggage at baggage claim carousel 5. |
|
de-icing |
The aircraft is undergoing de-icing before takeoff. |
|
fueling |
The fueling process is almost complete. |
|
pre-flight inspection |
A pre-flight inspection is required before every departure. |
|
boarding |
Boarding will begin in 10 minutes at gate 14. |
|
ground handling |
The ground handling crew is preparing the aircraft for takeoff. |
|
ramp agent |
The ramp agent coordinates baggage handling and aircraft movement. |
|
pushback tractor |
The pushback tractor is ready to move the plane from the gate. |
|
cabin crew |
The cabin crew is preparing for the flight. |
|
airbridge |
Passengers are boarding through the airbridge. |
|
gate agent |
The gate agent will announce the boarding process. |
|
ground delay |
There is a ground delay due to a backlog of flights. |
|
boarding pass |
Please show your boarding pass before entering the gate area. |
|
refuel |
The aircraft is being refueled before departure. |
|
maintenance check |
The aircraft is undergoing a routine maintenance check. |
|
flight operations |
Flight operations are running smoothly today. |
|
emergency evacuation |
The emergency evacuation drill was successfully completed. |
|
terminal |
Passengers should proceed to terminal B for international flights. |
|
disembark |
The passengers will disembark after the aircraft has parked at the gate. |
|
boarding gate |
The boarding gate is located on the left side of the terminal. |
|
airport shuttle |
An airport shuttle is available to transport passengers to the terminal. |
|
ground support equipment |
The ground support equipment is ready for use. |
|
terminal building |
The terminal building houses check-in counters and baggage claim. |
|
aircraft servicing |
The aircraft servicing team is checking the aircraft systems. |
|
gate hold |
The aircraft is in a gate hold due to a delay in the runway. |
|
security screening |
Passengers must undergo security screening before entering the gate. |
|
parking position |
The aircraft is now in its parking position. |
|
departure lounge |
Passengers can relax in the departure lounge before boarding. |
|
ground power unit |
The ground power unit has been connected to the aircraft. |
|
check-in counter |
Please go to the check-in counter to receive your boarding pass. |
|
security checkpoint |
Make sure to reach the security checkpoint before your flight time. |
|
aircraft parking |
The aircraft is parked next to the terminal after arrival. |
|
passenger jet bridge |
The passenger jet bridge connects the aircraft to the terminal. |
|
ground crew member |
The ground crew member will guide the aircraft to the gate. |
|
aircraft towing system |
The aircraft towing system is used to move the aircraft on the ground. |
|
lavatory servicing |
Lavatory servicing is performed during the ground stop. |
|
cargo handling |
The cargo handling team is loading the cargo into the aircraft. |